Menu

Capability

Resin Bound Driveways

Seamless. Permeable. Built for the long haul.

Overview

Seamless. Permeable. Built for the long haul.

Resin bound surfacing is the finish of choice for Dublin and Wicklow homeowners who want a contemporary, low-maintenance driveway that still reads premium. A UV-stable polyurethane resin binds hand-picked natural aggregates into a single seamless surface — no loose stones, no weeds, no fuss.

Every Prestige installation is built on a full structural base, not laid over tired tarmac. That discipline is why our resin driveways still look finished a decade on.

Resin Bound Driveways
Why Prestige

Built the way it should be built.

01

SUDS Compliant

Permeable surface drains naturally — no planning issue, no standing water.

02

Ten-Year Guarantee

Backed by a written guarantee and manufacturer warranty on the resin system.

03

Forty+ Aggregates

Choose from natural granite, basalt, quartz, and marble blends to suit the property.

04

Structural Base

Full depth sub-base and bound layer — the finish only lasts if the groundworks are right.

Process

Clear stages.
Zero shortcuts.

01

Survey

Site levels, drainage, and access mapped before specification starts.

02

Design & Scope

Materials and scope aligned with a clear fixed estimate.

03

Build

Groundworks and finishing by specialist teams with strict standards.

04

Handover

Final quality review, care guidance, and guarantee coverage issued.

AI Preview

See your driveway in resin before you commit.

Upload a photo of your front and our AI generates three photorealistic previews of how the space could look in resin bound. Free, no signup, takes about 30 seconds.

Owner's Guide

Aftercare & cleaning guide for resin bound surfaces.

How to look after a fresh install in the first 72 hours, the five points worth remembering long term, and a quick reference for cleaning. Available as a downloadable PDF.

FAQ

Common questions.

For residential front drives, yes — resin is permeable, cleaner looking, and available in dozens of finishes tarmac cannot match. Tarmac still wins on heavy commercial loading.

A standard home driveway is typically 5–8 working days from groundworks to handover, weather permitting.

Only if the base is sound. We always survey first — if we find cracks, slumping, or poor drainage, we rebuild before laying resin. That is why our work lasts.

Free Estimate

Ready to build this one right?

Share the project and a site surveyor will call within 24 hours.